powered by Pro Mach video

Pro Mach Web Site
ProCustomer Industry Leading Aftermarket Support
Allpax Retort Sterilization & Automation Systems
Axon Shrink & Stretch Sleeve Application Systems
Benchmark Food Distribution & Loading Systems
Brenton Case & Tray Packing & Robotic Systems
Currie by Brenton Conventional & Robotic Palletizing Systems
Dekka Case Taping Systems
Edson High Performance Case & Tray Packing Systems
EOL Packaging End of line Applications & Systems
EPI Labelers Flexible Packaging Labeling Systems
Federal Liquid Filling & Capping Systems
Flexible Packaging Flexible Packaging Applications & Systems
FLtecnics Rollstock Pouch Packaging Systems
Greydon Flexible Packaging Coding Systems
ID Technology Labeling, Marking & Coding Systems
Inever Stickpack & Sachet Packaging Systems
IPak Machinery Tray & Bliss Forming Systems
Jalbert Automation Services
KLEENLine Sanitary Product Handling Systems
LSI Pressure Sensitive Labeling Systems
Matrix Vertical Form Fill Seal Systems
NJM Packaging Pharmaceutical Packaging Systems
Orion Packaging Stretch & Pallet Wrapping Systems
Ossid Tray Packaging & Weighing Systems
Pace Packaging Bottle Unscrambling & Orienting Systems
Pacific Packaging Viscous Filling & Capping Systems
P.E. Labellers Decorative Labeling Systems
Rennco Vertical Bagging & Heat Sealing Systems
Roberts PolyPro Bottle & Box Handles & Application Systems
Shuttleworth Conveying & Material Handling Systems
Southern Packaging Rollstock Pouch Packaging Systems
Tekkra Shrink Bundling Systems
Texwrap Shrink Wrapping Systems
Toyo Jidoki Pre-Made Pouch Packaging Systems
Weiler Labeling Labeling & Serialization Systems
Wexxar/BEL Case Forming & Sealing Systems
Zalkin Americas Capping & Cap Handling Systems
Zalkin EMAA Capping & Cap Handling Systems
Zarpac Engineering & Integration Services

Powered by Pro Mach

UID Verification-Do I need all those lights?

Answer: Improved Results!
By: John O’Brien
UID Business Manager
Siemens Energy & Automation, Inc.

The folks who came up with the new AIM DPM 1-2006 Standard figured that the 10 individual lights or combinations they specified might be the difference between the camera being able to see the data matrix or not being able to see it. We have put a few examples below for illustrative purposes.

Consider this scenario:
You mark a part. It can be with a laser, dot peen, electro-chem etch. It might be a label or a data plate. It could be a flat item, or a round item, or a tube. Maybe the mark is protected by an overcoat to prevent corrosion. Now you need to have a verification report to ensure compliance with MIL STD 130 and the DFAR, as well as customer acceptance and payment.

You use a verifier with two sided, 30 degree lights because that is one of the acceptable AIM DPM 1-2006 methods. If it gets a good grade, you are done.

If it fails… is it a “bad” mark? (or just bad lighting?)
Is there a problem with your marking equipment? (or just lighting?)
Do you need to change marking systems? (or just the lighting?)
Do you need to change Marking methods? (or just lighting?)
Do you need to re-engineer your entire marking process or approach?
How much will this cost???

What if it is just a lighting issue? If you used a 90 degree light, or a dome light and got an “A” grade? What if this mark requires a 45 degree, 4 sided (45Q) light in order to be seen with sufficient contrast to be read?

DON’T RE-ENGINEER YOUR PROCESS – USE ALL THE LIGHTS AIM ALLOWS! It just takes a few seconds!

The table below is from the user screen for a verifier with the full array of AIM DPM 1-2006 lights (except the Dome, used on curved parts). Note that the 90 degree, 30T and 45Q lights passed, all others failed. Below the chart, we have posted pictures of the SAME SYMBOL, where the only thing that has changed is the lighting. Lighting changes the way the camera sees the symbol – often the difference between a “pass” and a “fail”.

UID Lighting Results-Pass Fail

Only the LIGHT has changed: Result_000011C8.jpg 90 Degree light “A” Grade (PASS)
UID Lighting Results, A-Pass

Result_000011C9 30Q lighting “F” grade

UID Lighting Results, F-Grade

Result_000011CE 30 degree, Single direction, East “F” grade UID Lighting Results, East F-Grade

UID Lighting Results
Here is another Summary. Again, only the light changes. Note the example – same image, field of view, angles, (we never move the part) and only the lighting changes.

The 30 T Passes below:
UID Lighting Results, 30T Pass

With a 45Q light, a different result : FAIL
UID Lighting Results, 45Q Fail

And the 30Q also FAIL
UID Lighting Results, 30Q, Fail

The Human eye and the Camera’s “eye” are different. We may see no contrast where the camera sees high contrast because of the lighting used. MIL STD 130 allows the newest verification guidelines form AIM, the AIM DPM 1-2006 Guidelines which allow a total of 10 different light configurations to evaluate the quality of your marking process.

It is much more expensive to change the process or marking method than it is to use all of the different lights the regulations allow. If you still can not achieve a passing grade, you then know you have no alternative but to modify your process.

Share Button

Speak Your Mind

*